Details: shifting of barge to a suitable working site or place from the r.l.i. site and blocking of the barge by area clearance, earth cutting, winching, jacking, planking, block fixing and un-jacking and placing of the r.l.i. site including tools and plants for blocking. (a) twin hull barge (16'6" × 9'0" × 3'0") removing the pump sets installed on the barge from the foundation including disconnecting. removal of suction and delivery assemblies from the barge to a secured place and refilling of the same properly after the maintenance of the barge opening, straightening and refitting of plates, angles, purlines, trusses, bollard expanded metal / brc net, winch etc as required and as per direction of e.i.c.(a) twin hull barge (16'6" × 9'0" × 3'0") patch/doubling work complete with 5 mm. m.s. plate including welding, gas cutting, fitting, fixing etc complete (a) cost of 5 mm. m.s. plate including wastage due to cutting including labour charges for straightening, fitting, fixing in position. (b) g
Sector: Water Resource Department