Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth. hire and labour charges for shoring work (including necessary close plank walling, framing, eucalyptus/jhou bulla piling, strutting etc) complete as per direction of the engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (this item should be executed on specific direction of the enginner in charge). ordinary cement
Sector: Zilla Parishad