Details: rectification or repairing of existing fhtc connection from c.i./d.i./upvc/hdpe/g.i./a.c. distribution pipeline with labour cost for cutting trench (1m x 0.9m x 1.2m) carefully without damaging the existing distribution pipe line, (in case of damaged if any pipe line during eexecution, necessary damaged should be repairing by the agency in his own cost) removing carefully old damage / good condition saddle piece, brass/gunmetal and refitting saddle pice and ferrule and all accessories, after connection work filling the trenches by earth all labour work are complete (excluding all necessary materials) as per direction of eic. provision for extra supply and laying of 15 mm nb pvc schedule 80)/20 mm od hdpe (pe 100, pn 16) pipe with all necessary specials 1.00 meter bellow the ground level including cutting trenches in all sorts of soil and filling up trenches as per direction of the e.i.c. making village road (avg. 3m width) crossing by horizontal auger borng for accomodation of laying o
Sector: Water supply and Sewerage