Details: tubewell with watertank earthwork in excavation of foundation trenches or drain, in all sorts of soil (including mixed soil, but excluding laterite or sand stone) including removing spreading or stacking the spoils within a lead of 75 mtr. as directed. the item includes necessary single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand. cement concrete with graded jhama khoa (30mm size) excluding shuttering in foundation & ground floor (1:3:6) proportion brick work with 1st class bricks in cement morter (1:6), in foundation & plinth hire and labour charges for shuttering with centering and necessary staging upto 4 mtr hight using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or straight in ground floor ordinary cement concrete(mix 3:1.5:1) m-20 with graded stonechips (20 mm down) excluding shutte
Sector: Zilla Parishad