Details: earthwork in excavation in the canals / drainage channels / borrow pits / river bed / of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. or making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including reaking clods, rough dressing etc. complete as per direction of the engineer-in-charge.(a) ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. extra rate over item no-1 for all kinds of soil for every additional lift of 1.50 m or part thereof beyond the initial lift of 1.50 meterfive additional lift earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ra
Sector: Irrigation