Details: mobilisation charges of all tools & plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of engineer-in-charge. b) detailed investigation. labour for making bore-holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting disturbed & un disturbed soil samples, conducting standard test at suitable intervals etc.) including preparation and submission of bore-log as per irc : 75 and 78 and clause 2400 of specifications for road & bridge works (5th revision), published by irc, and al
Sector: Irrigation