Details: dismantling of cement conc. work including stacking serviceable materials as directed as per pwd schedule earth work in excavation in foundation trenches at different soil including trimming watering complete as directed as per pwd schedule sand filling at foundation , plinth with watering ramming complete as direcrted as per pwd schedsule cement concrete ( 1:2:4 ) with 30 mm. down graded shingles excluding shuttering complete as per pwd sched hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels and striking out after completion of works (at foundation upto plinth). 60 mm thick interlocking designer concrete paver block m35 grade for light-traffic zone,commercial & office complex,tourist resort as per is: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk wbm/ wmm base course & 250 mm thk bound gnaular /gr
Sector: Higher Education