Details: insulation detailed engineering consultancy and project management for complete project planning, scheduling, designing, preparation, submission of drawings, documents, detailed project report (dpr), quality assurance plans, vendor documents reviewing, monitoring and surveillance of project execution for the entire epc package for 26 mw floating solar pv project at reservoir 1b of ntpc sipat for ntpc, sipat deployment of manpowerproviding technical assistance through out the contract period, agency has to supply the following manpower during the enter contractual period providing exclusive service to bandr which should be considered as per instruction of engineer-in-charge. agency need to pay the consolidated amount to the manpower directly as per the certification of engineer-in-charge and also failing which, b&r will deduct the said amount alongwith service charges from their monthly r.a. bill.the quoted manmonths rates shall be inclusive of all wages, overtime for working beyond no
Sector: Infrastructure