Details: excavation of soil for making of trial hole ( minm. size 1.1 x 0.5 x 1.2m depth ) as per instruction of the site engineer including backfilling the excavated soil. survey of h.t cable route as per instruction of site engineer and submission of route survey drawing ( in two copies) inscribing different land marks micro-tunnelling work with laying of hdpe pipe as per instruction of site ingineer and as per site condition for laying of u.g. cable including supply of hdpe pipe (except cable laying)as per is: 4984-2016 including preparation and submission of drawing for such cable laying:with 160mm dia. hdpe pipe of pe-80, pn-6 making of jointing pit only by the excavation of soil suitable for making of straight through joint of following cables including laying of platform with bricks for placement of joint box & pitching up of temporary tent by providing bamboo & tarpolene & re-instatement, of the joint pit with the excavated soil after completion of jointing work: 11 kv laying & dressi