Details: mobilisation charges of all tools & plants along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting up boring rigs and shifting to different bore-hole points etc. and also including withdrawal of same from the site after completion of work, complete as per direction of engineer-in-charge.b) detailed investigation carriage of all disturbed & undisturbed samples from site of work to the divisional office or elsewhere including loading and unloading as per direction of engineer-in-charge. detailed investigation.note: some samples are to be kept at sub-division office for additional testing by the engineer-in-charge. labour for making bore-holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, , silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting disturbed & un disturbed soil samples, conducting st
Sector: Irrigation