Details: cutting and clearing jungles including shrubs, water weeds, bushes, trees, plants, upto 30cm. girth including removing as directed by engineer-in-charge. earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75 m.in ground floor including roof. upto 150 mm. thick. earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direct
Sector: Irrigation