Details: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.a) depth upto 3m without pumping out water and shoring as required earth work in filling in foundation trenches with earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or fresh excavation of land arranged by department with in a lead of 50m construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and
Sector: Zilla Parishad