Details: vide pwd(roads) sor,vol-iii,page -276,item no-11.01 excavation for structures :: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. sl no.2, vide pwd sor, vol-iii, page-332 & 333 item- 18.07-a) providing and laying design mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the engineer-in-charge and cost for quality control, sampling, testing etc. all complete but excluding cost
Sector: Zilla Parishad