Details: box cutting or filling in road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power rollerto proper camber and grade as per direction and satisfaction of engineer-in-charge including uprooting and removing plants and jungles when and wherenecessary.(a) depth up to 150 mm. supplying, spreading and consolidating stone dust to a depth of 100 mm and above at desired densityand c.b.r. as per specification with power roller to proper gradient and camber including watering as necessary and lighting,guarding,barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as perspecification supplying & laying polythene sheet below the p.c.c road providing and laying design mix
Sector: Zilla Parishad