Details: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by department within a lead of 150 m. hire and labour charges for shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. the rate is inclusive of fitting, fixing and striking out after completion of work as per spec
Sector: District Administration