Details: earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initiallead of 50m and initial lift of 1.5m(mode of measurement: pre works and post works) laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. cost of stone boulder 150 mm size delivered ans stacked at site. ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant is codes. hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). plum concrete work with 40 % cement concrete with 30 mm
Sector: District Administration