Details: ( pwd vol-iii,item no-3.14 , page no-236 ) construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1 for rural roads of mord. (borrow pit /pre work post work measurement)a) with carried earth up to lead not exceeding 2.00 km (pwd vol-iii,item no-4.09(i) , page no-244) construction of sub base using local materials, spreading in uniform layers with motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with rotavator at omc, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per clause 401 of specifications for
Sector: Zilla Parishad