Details: stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing within a lead of 75m as directed. ground floor plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including , nosing and drip course, scaffolding/staging where necessary (ground floor).[excluding cost of chipping over concrete surface] 15 mm thick plaster ground floor dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars. in ground floor including roof hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto
Sector: PWD