Details: earth work in excavation of foundation trenches or derains,in sorts of soil(including mixed soil but exclunding laterite orsandstone) including removing,spreading orstacking the spoils within a iead of 75 m as directed . the item includes necessary trimming the sides of trenches , levelling,dressing and ramming the bottom , bailing out water as required complet. (a) depth of excavation not exceeding 1.500 mm. earth work in filling of foundation trenches or plinth with good earth in layers not exceeding 150mm. including watering and ramming etc. layer bylayer complete (payment to be made on the basis of measurement of finished quantity of work) (a) with earth obtained from excavation of foundation. filling in foundation or plinth by silver sand in layers not exceeding 150 mm single brick flat solinq of picked jhama bricks including ramming and dressing bed to proper level and filling joints wiith local sar ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mmnominal size)
Sector: Zilla Parishad