Details: earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. the item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) depth of excavation not exceeding 1,500 mm. earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (payment to be made on the basis of measurement of finished quantity of work) (a) with earth obtained from excavation of foundation. supplying and laying polythine sheet (150g/sqm) over damp proof cource or below flooring or roof terracing or in foundation trenches. providing and laying design mix concrete for plain / re
Sector: Zilla Parishad