Details: patching of potholes by draining water, cutting the pothole area to rectangular shape with vertical edges, removing all loose materials, screening and stacking the same for reuse with new materials as per requirement, filling the pothole area with additional volume of crushed stone materials / laterite / jhama / broken shingles / coated stones of pakur variety etc. and screenings as applicable, and compacting the same with static roller as per water bound macadam specification, including cost of all materials and machineries. dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per technical specifications clause 202 for rural roads of mord. (i) by manual means. b) granular courses water bound macadam base courseproviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing,
Sector: PWD