Details: supplying, laying, fiting, fixing and jointing of upvc pipes onforming to is:4985-2000 with latest revision and amendments, if any, with ecessary upvc/ci specials, cidf sluice valves, as per relevant i.s. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing elephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as pplicable by the respaective authority will be borne by the agency in his own cost. loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good uality/approved brand solvent cement (as per
Sector: Water supply and Sewerage