Details: earth work in excavation of the foundation tranches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing spreading or stacking the spoils within a lead of 75mtr as directed. the item including necessary trimming the sides of tranches, levelling, dressing and ramming the bottom, bailing out water etc. as required complete. depth of excavation not exceeding 1500 mm. earth work in filling in foundation trenches or plinth with good earth obtained from excavation of foundation in layers not exceeding 150mm including watering and ramming etc. layer by layer complete. (payment to be made on the basis of the measurement of finish quality of work). dismantle all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site &removing the as directed within a lead of 75 mtr in ground floor including roof. dismantle all types of plain cement concrete works up to 150 mm thick stacking serviceable mat
Sector: Harbor