Details: clearing compound premises of shurbs, plants, jungles etc.by cutting and removing as directed (specific permission of engineer-in-charge prior to execution will be necessary).(payment to be made on area cleared) dismantling all types of masonry excepting cementconcrete plain or reinforced, stacking serviceablematerials at site and removing as directedwithin a lead of 75 m .a) in ground floor including roof. dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing as directed within a lead of 75m a) in ground floor including roof.upto 150mm. thick. dismantling r.c. floor, roof, beams etc. including cutting rods and removing as directed within a lead of 75 m. including stacking of steel bars. (a) in ground floor including roof. earthwork in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone ) including removing spreading or stacking the spoils
Sector: Urban Authority