Details: cleaning of box type drain along the road and removal of silt ,slip and uprooting weeds, if any, upto height of 1 mtr. on hill side. (analysed) cleaning of 'v' type drain along the road and removal of silt ,slip and uprooting weeds, if any, upto height of 1 mtr. on hill side. (analysed) weaving wire mattress as directed with wire of 4mm dia. and making sausage crate of required shape after tying all intersections including joining longitudinal ends, closing ends of sausage, carriage of wire to site of work complete in all respect as per direction of the engineer-in-charge including cost of supply of g.i. wire. (with 100mm x 100mm mesh.)(v/p-336,i-18.3,of pwd sor(rds) labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rollingand preparing the bed to proper level and filling up all joints with sandy clay or earth.(analysed) excavation for structures
Sector: Distribution