Details: earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75m.as directed.the item include snecessary trimming the sides of trenches,levelling,dressing and ramming the bottom, bailing out water as required complete. (a) depth of excavation not exceeding 1,500 mm. labour for laying150mmto200mmboulder soling includingrough dressinghandpackingandrammingdownsmallpieces intheinterstics without rolling andpreparingthebedtoproperlevelandfillingupall joints with sandy clay or earth. (analysis rate) (i) cement concrete with graded stone ballast (40 mm size excluding shuttering) in ground floor(b) with n.b. variety stone metal. (a) 1:3:6 proportion hireandlabourchargesforshutteringwithcenteringandnecessarystaging upto4musingapprovedstoutpropsandthickhardwoodplanksofapproved thickness with required bracing for concrete slabs, beams and columns, lint
Sector: District Administration