Details: earth work in excavation of foundation trenches or drains, in all sorts of soil including mixed soil but excluding laterite or sandstone) including moving, spreading or stacking the spoils within a lead of 75 m.as directed. the item includes necessary trimming the sides of trenches, levelling, ressing and ramming the bottom, bailing out water as required complete. a) depth of excavation not exceeding 1,500 mm. (page no-01, item no-02(a)) supplying and laying polythene sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. (page no-47, item no-03) ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. a) pakur variety (page no-24 of 315,itemno-4(a) earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer
Sector: Zilla Parishad