Details: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 for rural roads of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. {road sch w.e.f. 30.8.2018,sec. page no - 282, item no - 11.01} filling in foundation or plinth by silver sand in layers not exceeding 150 mm. ordinary cement concrete (mix 1:2:4) m - 15 with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. ordinary cement concrete (mix 1:1.5:3) m - 20 with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant is codes. reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (
Sector: Zilla Parishad