Description: Development of New Greenfield Airport at Dholera Ahmedabad Gujarat Phase 1 SH Design Supply installation Testing commissioning and All inclusive comprehensive maintenance including operation of Arrival and Non Inline Departure BHS Name of Work Development of New Greenfield Airport at Dholera Ahmedabad Gujarat Phase 1 SH Design Supply Installation Testing Commissioning and All Inclusive comprehensive maintenance including operation of Arrival and non inline Departure Baggage Handling System for New Integrated Passenger Terminal Building at Dholera Airport
Details: SH:I SITC OF PASSENGER BAGGAGE HANDLING SYSTEM Supply of Departure & Arrival Conveyor System Design, Manufacturing and Supply of Following equipment's / Components of Departure & Arrival conveyor system as per the technical specifications and conveyor layout drawings, Including supply of required length of power and control cables from control panel to various drive units, including all items/accessories and steel structure as per site requirement complete in all respect for successful commissioning of following system: Check-in conveyor system in two sections comprising of Weighing & Labelling and Dispatch conveyor of minimum length 1200 mm with minimum useful width of 650 mm between side walls along with drive unit for each conveyor section with display range 0- 200 Kg with accuracy of + 0.05% and two displays (Each for Passenger and Airlines staff) including load sensor and toppling devices etc.One set comprises of 01 no. weighing & labelling conveyor, 01 no. dispatch conveyor and 0
Sector: Airport