Details: disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge.note - item to be applicable in urban areas having directions for restricted hours for movement / plying of load carrying motor vehicle of 3.5 or more. notes :1 ) voids @ 20% for solids and 50% for rock shall be dedcuted from fully loaded truck measurement to arrive at the net quantity for payment in case of direct measurement is not possible. 2) the cost is inclusive of necessary permisiion from statutory authorities for dumping the debris/excess earth outside department premises. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,
Sector: Research center