Details: item description excavation for structures (earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) plain/reinforced cement concrete in open foundation complete as per drawing and technical specifications.(a) grade m15 gabion protection wall :gabian structure for erosion control, river training works and protection works (providing and constructing gabain structures for erosion control, river training works and protection works with wire crates of size 2 m x 1 m x 0.3 m each divided into 1m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 mpa conforming to is:280 and galvanizing coating conforming to is:4826, woven into me
Sector: Road development