Details: name of work :amrut sarovar no.1 excavation for deepening of pond / check dam including transporting and spreading the excavatedmaterial for raising of embankment in uniform layer or as directed including dressing breakingclods etc for leap up to 1 km and all lift without rolling and watering etc. complete.2 providing and laying in position cement concrete m15 using cement sand and machine crushedcourse aggrigate including providing nesessary form work compaction, finishing and curring asrequired etc complete.3 providing cement plaster 20mm thick in c.m. (1:3) including racking out joints 20 mm deepincluding smooth finishing etc. complete.4 back fill with selected earth from outside borrow area or from excavated usefull material includingwatering, ramming, consolidation etc. with pneumatic templing and lead upto 1.0 km. and all lift etc.completed.5 providing and fixing marble plate 45cms x 60 cms size including engraving for letters as directedetc. complete.
Sector: Irrigation