Details: name of work :chack dam no.2 excavation for depening of pond / check dam includingtransporting and spreading the excavated material for raisingof embakment in uniform layer or as directed includingdressing breaking clods etc for leap up to 1 km and all liftwithout rolling and watering etc. complete.(s.o.r n.w.w&k.d p.no.15 i.no.22)69.30 cmt 5058.902 6041.43 transporting including rehandling and spreading of the usefulexcavated materials of c.o.t., spillway foundation, approachchannel, tail channel, hr, inspection road, approach road, etcfor embankment raising including spreading in uniform layersof specified thickness, dressing, breaking clods & rolling atrequisite moisture content to required dry density withsuitable type of roller and watering at omc for lead upto 1.0km and all lift etc complete. (s.o.r n.w.w&k.d p.no.1 i.no.5)55.73 cmt 336688.893 110.86 providing and laying in position cement concrete m15 usingcement sand and machine crushed course aggrigate includingproviding neses
Sector: Irrigation