Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-in charge gravel packing in tubewell construction in accordance with is: 4097, including providing gravel fine/ medium/ coarse, in required grading & sizes as per actual requirement, all complete as per direction of engineer-in-charge dry stone rubble packung in the base of road providing and laying cement concrete 1:3:6(1 cement : 3coarse sand : 6 stone aggregate ) 150mm thick to laying base coarse of road .including mixing,batching, placing and curing etc.,and as directed at site including the cost of all materials, labours, tools & plants , cost of curing etc., complete. centering and shuttering including strutting, propping etc and removal of form for columns, pillars, piers, abutments, posts and struts, inclu
Sector: Harbor