Details: dismantling disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. for thickness of tiles 10 mm to 25 mm. dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. dismantling wooden boarding in lining of walls and partitions, excluding supporting members but including stacking within 50 metres lead: thickness above 25 mm up to 40mm. dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead
Sector: Tourism