Details: (1) earth work (1.1) excavating holes more than 0.10 & upto 0.5 including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 in and lif upto 1.5m. (1.1.1) all kinds of soil (2) cement concrete (cast in situ) (2.1) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level : (2.1.1) 1:1½:3 (1 cement: 1½ coarse sand (zone-iii) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (2.1.2) 1:4:8 (1 cement : 4 coarse sand (zone-iii) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (2.2) centering and shuttering including strutting, propping etc. and removal of form work for: (2.2.1) foundations, footi
Sector: Industry Development