Details: development & improvement as a children theme park of teacher's park earth work in excavation by mechanical means (hydraulic excavator/ manual means over areas (excedding 30 cm in depth. 1.5 m in width as well as 10 sqm on path) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m neatly dressed . all kinds of soil. filling available excavated earth (excluding rock) in trenches, plinth,sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and water. lead up to 50 m and liftuoto 1.5 m. disposal of moorum/building / malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of engineer-in-charge. supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thicknes
Sector: Municipality