Description: Construction of fenced boundary wall with M S gate and other allied development works like P F of paver blocks and C o internal storm water drain etc in 3 76 MLD capacity STP in Sector G2 and G6 Narela Name of Work D o land at sector G2 G6 Narela sub city Sub Head Construction of fenced boundary wall with M S gate and other allied development works like P F of paver blocks C o internal storm water drain etc in 3 76 MLD capacity STP in Sector G2 G6 Narela
Details: Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:a) Cement mortar 1:4 (1 cement : 4 coarse sand) Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in :a) cement mortar 1:4 (1 cement : 4 coarse sand) 12 mm cement plaster finished with a floating coat of neat cement of mix :a)1:4 (1 cement: 4 fine sand) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :a)1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50
Sector: Urban Authority