Description: REPAIR AND MAINTENANCE OF INFRASTRUCTURE ASSETS IN R IV DIVISION DURING 2022 23 Sub Head CONSTRUCTION OF FOUNTAIN BODY OF LINEAR FOUNTAIN WITH SANTUSHTI WALL NEAR VINAY MARG AND PANCHSHEEL MARG CORNER Name of work Repair and Maintenance of Infrastructure Assets in R IV Division during 2023 24 Sub Head CONSTRUCTION OF FOUNTAIN BODY OF LINEAR FOUNTAIN WITH SANTUSHTI WALL NEAR VINAY MARG AND PANCHSHEEL MARG CORNER
Details: Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre leadas per direction of Engineer-in-Charge. sqm Taking out DQ stone flooring of size 100x100 mm and 70 - 80 mm thick of all types from footpath/central verge, including removal of mortar etc.,disposalof unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:4:8 or leaner mix (i/c equivalentdesign mix) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not ex
Sector: Municipality