Description: Comprehensive maintenance of Vinitec MakeOnline UPS System at Honble LG House Minister Bungalows Delhi Name of Work Running Maintenance Operation of Specialized Electrical Mechanical Services installed in 4 Nos Ministers Bungalows at 8 Raj Niwas Marg 2 Nos Minister Bungalow at 3 Attur Rehman Lane Hon ble LG Residence and Secretariat at Raj Niwas Marg ble CM Residence Camp office at 6 Flag Staff Road Delhi SH Comprehensive maintenance of Vinitec Make Online UPS System at Hon ble LG House Minister Bungalows Delhi
Details: Annual Comprehensive maintenance of existing following capacity three phase UPS replacement of worn out parts like PCB, IGBT based, Diode, Capacitors, relay, cooling fan, etc (but excluding transformer & batteries), testing etc complete as reqd.1st Yeara) 40 KVA 3 Phase Online UPS System - 03 Nos. b) 30 KVA 3 Phase Online UPS System - 01 Nos. c) 20 KVA 3 Phase Online UPS System - 02 Nos. d) 1 KVA 3 Phase Online UPS System - 02 Nos. 2nd Yeara) 40 KVA 3 Phase Online UPS System - 03 Nos. b) 30 KVA 3 Phase Online UPS System - 01 No. c) 20 KVA 3 Phase Online UPS System - 02 No. d) 1 KVA 3 Phase Online UPS System - 02 Nos. Comprehensive Maintenance of 70 Amps capacity Automatic Phase Sequence Corrector (Make: Vinitec), three phase replacement of worn out parts like PCB, relay, indicator, power wiring, control wiring connectors, lugs, wires switches, fuses, etc. (but excluding Power Contactor), etc. complete as reqd.1st yeara) Automatic Phase Sequence Corrector 70 Amps Qty : 6 Nos 2nd Yeara)
Sector: PWD