Description: Renovation of Standard Capacitors make APFC panel installed at Sector-9 SPS Re-invite--Name of Work: Renovation of Standard Capacitors make APFC panel installed at Sector-9 SPS (Re-invite)
Details: Dismantling of defective capacitor banks from fixed units of HT motors including dismantling of termination, bus bar links and rusted hardware etc. from the existing banks of motors and transporting the same to the store and allied works etc. as required at site. Supply of 250 KVAr 6.6 KV, 3 ph. HT Fixed Capacitor banks for motors , complete with terminal cover, mounting frame of angle iron, post insulators, aluminum bus bar links for fixing protective fuses and cable end box for cable termination-make standard Supply of 100A , 6.6 kV HT HRC fuses for replacement of blown fuses in fixed capacitor banks of motors -make Eswari/Anand/ standard/Phoenix Supply of 145 kvar 6.6 kv, 3 ph. HT Fixed Capacitor banks for motors , complete with terminal cover, mounting frame of angle iron, post insulators, aluminum bus bar links for fixing protective fuses and cable end box for cable termination-make standard Installation of 250 kVAr & 145 KVAr 6.6 kV HT fixed capacitor banks of motors with angle
Sector: Water supply and Sewerage