Details: deployment of staff for operation, watch and ward of booster pumping station at new kondli of 3 nos. 220 kw electric pump sets including 2 nos. transformer, 11 kv panel, control valves and allied electric panel board, by deployment of 01 no skilled (pump operator) and 2 no unskilled (beldar) in each shift at bps new kondli. note: - in addition to above including cleaning of pump house (inside & outside/toilet block), breakdown report of all equipment, power failure report and also complaint lodged to power agencies and immediate report the same to engineer in charge by providing necessary arrangement, morning and evening timely report to engineer in charge by operational staff using the mobile phone. # epf and esi will be paid by the contractor to engaged workers. epf @13% on labour part esi @3.25% on labour part
Sector: Water supply and Sewerage