Details: replacement of non return valve and other allied work at b.d. block bps under ae (e&m)-ii with following works: - all the required works, materials, arrangements, tools & tackles, workmanship, safety equipment's as per nhrcingt\dpcc etc. guidelines and as per site requirement, remodeling all the damages up to standard if occurred any complete in all respect as per requirement satisfactorily job engineer- in - charge. dismantling the old non return valve by cutting the old/rusted nut bolt by the gas cutter and remove the non-return valve at site which are not working at site by required tools and tackles etc. as per required the site. providing the non return valve 200 mm dia. p.n-1.0 is. 5312 part 1make: kirloskar/upadhayay fixing charges for above material at site with agreement by gas cutter, welding machine, electric city, safety equipment and fixing charges at site as per requirement. painting of the complete structure with brush with one coat of primer & two coat of enamel paint i
Sector: Water supply and Sewerage