Details: demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) demolishing brick work manually/ by mechanical means including stackingof serviceable material and disposal of unserviceable material within 50metres lead as per direction of engineer-in-charge. in cement mortar earth work in excavation by mechanical means (hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming ofbottoms, lift upto 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soil as directed, within a lead of 50 m. all kinds of soil. providing and laying in position cement concrete of specified grade excludingthe cost of centering and shuttering - all work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded
Sector: Irrigation