Details: maintenance of palam link drain for the period of 180 days by removing all type of sullage, , rank vegetation, garbage, polythene bags etc. and other floating material from the bed of drain including all under bridges/culverts above water level, side slopes and top of the both banks by deploying adequate manual labour/machinery at nearby mcd dhalao/any other designated site, on daily basis or under water as well as in foul conditions including disposal of above removed material. hiring of tractor trolley with fuel and operator complete for disposal of all type of sullage, , rank vegetation, garbage, polythene bags etc as per direction of engineer-in-charge. deployment of hydraulic excavator (3d) with driver and fuel for disposal of all type of sullage, , rank vegetation, garbage, polythene bags etc as per direction of engineer-in-charge.
Sector: Irrigation