Details: demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) excavation of silt including malba, earth debries, ploythene bed all floating material etc. from the bed of drain and disposal of excavated material at own source of contractor by mechanical transport upto lead of 5.00 km and lift upto 1.5 m complete as per directions of engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated so
Sector: Irrigation