Details: part athe 2500 kva, 11kv/440v transformer at the okhla stp was safely dismantled and transported to the greater kailash bps for reuse. all electrical connections will be safely disconnected—this includes outgoing ht cables from the ht panel, ht input cables from the transformer, and the lt busbar connections. once electrically isolated, we will begin dismantling the transformer by removing the external components such as radiator fins and draining the transformer oil into secure, clean drums for reuse. using a hydra crane and skilled labor, the transformer will be carefully taken out of its room, ensuring no damage to the structure or equipment. it will then be lifted onto a tempo or suitable transport vehicle along with all dismantled parts. upon reaching the new site, like greater kailash, we will reassemble the transformer with the help of the hydra, reinstall the fins, and refill the stored oil into the conservator and main tank. proper alignment, earthing, and safety checks will b
Sector: Water supply and Sewerage