Details: Description:- 1.Supply of Ballast/Gravel in the Switch Yard. (Supply)22 280.00 9.35 2618.00 AT Par 2618.00 Above/ Below/ParDescription:- 2.Spreading of Ballast/Gravel in the Switch Yard. ( )33 5800.00 Each 72.91 422878.00 AT Par 422878.00 Above/ Below/ParDescription:- 3.Painting of Fencing Panel/masts.44 50.00 Sqm 1929.39 96469.50 AT Par 96469.50 Above/ Below/ParDescription:- 4.Cable Trench Cover (Supply).55 50.00 Sqm 495.95 24797.50 AT Par 24797.50 Above/ Below/ParDescription:- 5.Cable Trench Cover ( ).66 625.00 Each 235.58 147237.50 AT Par 147237.50 Above/ Below/ParDescription:- 6.Base painting & writing work on OHE structure (Supply).77 50.00 Numbers 4461.43 223071.50 AT Par 223071.50 Above/ Below/ParDescription:- 7.Supply of single earth electrode with earth pit complete as per RDSO Drg. No. ETI/OHE/P/7020 or latest.88 50.00 Numbers 1242.10 62105.00 AT Par 62105.00 Above/ Below/ParDescription:- 8. of single earth electrode with earth pit complete as per RDSO Drg. No. ETI/OHE/P/7
Sector: Railways