Details: requirement of material for psi installation for psi/mut & psi/smql. 1 1320.00 1492.46 1970047.20 at par 1970047.20 above/ below/pardescription:- 1.supply of ballast/gravel in the switch yard. (supply)22 1320.00 9.35 12342.00 at par 12342.00 above/ below/pardescription:- 2.spreading of ballast/gravel in the switch yard. ( )33 8218.00 each 72.91 599174.38 at par 599174.38 above/ below/pardescription:- 3.painting of fencing panel/masts.44 370.00 sqm 1929.39 713874.30 at par 713874.30 above/ below/pardescription:- 4.cable trench cover (supply).55 370.00 sqm 495.95 183501.50 at par 183501.50 above/ below/pardescription:- 5.cable trench cover ( ).66 2750.00 each 235.58 647845.00 at par 647845.00 above/ below/pardescription:- 6.base painting & writing work on ohe structure (supply).77 25.00 numbers 4461.43 111535.75 at par 111535.75 above/ below/pardescription:- 7.supply of single earth electrode with earth pit complete as per rdso drg. no. eti/ohe/p/7020 or latest.88 25.00 nu
Sector: Railways