Description: A R and M O to various roads under PWD Division NWR 2 during 2025 26 SH Urgent repair of damage drain and footpath on Road No 30 under Sub Division NWR 24 Section II Name of Work A R M O to various roads under PWD Division NWR 2 during 2025 26 SH Urgent repair of damage drain and footpath on Road No 30 under Sub Division NWR 24 Section II
Details: Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform Edges of slabs and breaks in floors and walls Under 20 cm wide Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland Cement, admixtures in recommended proportions as per IS: 9103 to accelerate / setting of concrete, to improve durability and workability without impairing strength but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: In case the cemen
Sector: PWD